• * USE IN CONJUNCTION WITH STORED ... - Smooth Pavements

    item for Portland cement concrete pavement. Cracked pavement slabs which require repair in accordance with the provisions of Subsection 401-4.03(B) will be paid for at 80 percent of the contract unit price for the pavement repaired, as measured between the original longitudinal and transverse pavement joints abutting

  • 2015 DIVISION 400 - CONCRETE-FINAL

    Documents, select the type of portland cement or blended hydraulic cement according to TABLE 401-1. Design concrete with a maximum water to cementitious ratio of 0.50 and minimum cementitious content of 480 lbs per cubic yard except for concrete for pavement and shoulders. d. Blended Cement Concrete.

  • DIVISION 400 – PAVEMENTS

    SECTION 475 – PORTLAND CEMENT CONCRETE PAVEMENT SECTION 401 – PLANT MIX PAVEMENTS – GENERAL 401.1 – GENERAL 401.2 – MATERIALS A. Aggregates B. Bitumen C. Job Mix 401.3– CONSTRUCTION OPERATIONS A. Mixing Plants B. Placing Paving C. Compaction D. Joints 401.1 – GENERAL Plant mix pavements comprise a large percentage of the State's ...

  • 401 PORTLAND CEMENT CONCRETE PAVEMENT

    The details for batching, hauling, and mixing materials for Portland cement concrete used in concrete pavements will be discussed in Section 1006 of this manual and the applicable portions of Section 401-3. One of the most important requirements for obtaining a smooth and durable concrete pavement is maintaining a uniform slump in the concrete ...

  • SECTION 500 -- CONCRETE PAVEMENT SECTION 501 -- …

    This work shall consist of QC/QA portland cement concrete pavement, PCCP, placed on a preparedsubgrade orsubbase in accordance with 105.03. 501.02 Quality Control. The mixture for PCCP shall be produced by an approved plant in accordance with ITM 405, transported, and placed according to a

  • Section 701 - Portland Cement Concrete for Structures ...

    Jul 26, 2013· Portland Cement Concrete for Structures. UNOFFICIAL TEST VERSION This version of this document is not intended to be used as reference in any legal matter. For the official version, please refer to the 2012 Standard Specifications for Construction - Section 701.

  • SECTION 4.01 CONCRETE PAVEMENT - Connecticut

    CONCRETE PAVEMENT 4.01.01--Description: This pavement shall consist of Portland Cement Concrete, with or without reinforcement, in conformity with the lines, grades, thickness, and typical cross section as shown on the plans. 4.01.02--Materials: The materials for this work shall conform to the requirements for concrete pavement under M.03.

  • 02700 - PORTLAND CEMENT CONCRETE PAVEMENT

    PORTLAND CEMENT CONCRETE PAVEMENT SECTION 02700 PORTLAND CEMENT CONCRETE PAVEMENT PART 1 GENERAL 1.01 – GENERAL 1.02 – Section Includes ... Limestone: IM 401 9. Aggregates a. Fine aggregates 1) Standard Specification – …

  • ITEM 451 REINFORCED PORTLAND CEMENT CONCRETE PAVEMENT

    ITEM 451 REINFORCED PORTLAND CEMENT CONCRETE PAVEMENT. 451.01 Description 451.02 Materials 451.03 Equipment 451.04 Setting Forms 451.05 Fine Grading of Subgrade or Subbase 451.06 Placing Concrete 451.07 Placing Reinforcement 451.08 Joints 451.09 Finishing 451.10 Curing 451.11 Removing Forms 451.12 Surface Smoothness

  • Forms and Manuals - New York State Department of ...

    03/1998. BR 317. Aggregate Tests For Portland Cement Concrete Plant. 07/2009. BR 319. SUPERPAVE Design PGB Content Compacted Specimen Density Worksheet. 01/2017. BR 324a. Computation of Daily Quantity Adjustment Factors for Air Voids Controlled Mixtures.

  • Section 601 - Portland Cement Concrete for Pavements ...

    Jul 29, 2013· 601.01. Description. This work consists of providing and placing a concrete mixture of portland cement, blended portland cement, supplemental cementitious materials, fine aggregate, coarse aggregate, water, and admixtures, combined in proportions for the grades of concrete required. The term "sack" refers to a 94 pound sack of cement.

  • WEST IA DEPARTMENT OF TRANSPORTATION …

    Dec 07, 2017· 401.12 Method of Measurement DIVISION 500-RIGID PAVEMENT 501 Portland Cement Concrete Payment 13 501.9.1 Safety Edge 501.13 Surface Tolerance 501.22 Method of Measurement DIVISION 600-INCIDENTAL CONSTRUCTION 601 Structural Concrete 15 601.7 Mixing 601.11.4.3 Straightedge Testing of Hardened Bridge Decks

  • Concrete Pavement - Portland Cement Association

    Portland Cement Association. 5420 Old Orchard Road; Skokie, Illinois 60077-1083; 847.966.6200 ; 200 Massachusetts Ave NW, Suite 200; Washington D.C., 20001

  • DATE OF REQUEST: REQUESTOR'S ORGANIZATION

    401-Portland-Cement-Concrete-Pavement-Request-Form Author: ADOT Created Date: 8/15/2017 11:44:26 AM ...

  • CHAPTER 4: SURFACE TREATMENTS AND PAVEMENTS

    Jul 25, 2000· 401 PORTLAND CEMENT CONCRETE PAVEMENT . 401-1 Description . High quality concrete pavement requires characteristics of durability and structural soundness in order to withstand the destructive forces of traffic, changes in moisture, temperature, and variable soil conditions.

  • ITEM 608.01030009 DESIGN OF CURB RAMP …

    Plant Production 401-2 Portland Cement Concrete - General 501-2 Portland Cement Concrete Foundation for Pavement 503-2 Sidewalks, Driveways, Bicycle Paths and Vegetation Control Strips 608-2 Curb and Curb & Gutter 609-2 Topsoil 610-2.01 Turf Establishment 610-2.03 Work Zone Traffic Control 619-2 Traffic Signals 680-2

  • City of Lincoln 2020 Standard Specifications Chapter 4 ...

    2020 city of lincoln standard specifications 401 chapter 4 – portland cement concrete (pcc) pavement . city of lincoln, nebraska, standard specifications chapter 4 portland cement concrete (pcc) pavement article title 4.09 f. combined curb and gutter, concrete barrier curb, or concrete median curb 413

  • ODOT District 4 --- Pavement General Notes

    Jun 21, 2005· item 254 pavement planing, asphalt concrete, as per plan. revised 06/07/2004p402: item 254 - pavement planing, portland cement concrete, as per plan this item of work shall be performed in conformance with item 254 in the cms except the depth shall vary from 2" to the top of the adjacent brick whichever is first.

  • 401 - CONCRETE SECTION 401 CONCRETE DIVISION 1100 …

    Documents, select the type of portland cement or blended hydraulic cement according to TABLE 401-5. TABLE 401-5: PORTLAND CEMENT & BLENDED HYDRAULIC CEMENT Concrete for: Type of Cement Allowed Bridge Deck Wearing Surface and Concrete Pavement Type IP Portland-Pozzolan Cement Type I(PM) Pozzolan Modified Portland Cement

  • REVISED ITEM P-501 - PORTLAND CEMENT CONCRETE …

    PROPOSED SPECIFICATION FOR CONCRETE AIRFIELD PAVEMENT 1.0 DESCRIPTION 1.1 General This work shall consist of pavement composed of hydraulic cement concrete, constructed on a prepared underlying surface, in accordance with these specifications and shall conform to the lines, grades, thickness, and typical cross sections shown on the plans.

  • SECTION 501 PORTLAND CEMENT CONCRETE PAVEMENT

    PORTLAND CEMENT CONCRETE PAVEMENT 501.01 DESCRIPTION This work is the construction of PCCP on a prepared subgrade or base course. 501.02 MATERIALS 501.02.1 Concrete Furnish concrete in accordance withSection 551 for Class Pave concrete. A. Cement. Furnish Type I or II portland cement listed on the QPL, in accordance with Subsection 551.02.1.

  • PART IV -- SURFACE COURSES

    Recycled Portland Cement Concrete 1.30 Reclaimed Asphaltic Pavement 1.50 Materials delivered by weight (mass) will be measured by the ton (2,000 pounds) [Mg (1,000 kg)] in hauling vehicles and divided by the following factors to determine the pay volume: Table 401-2 Adjusted Vehicular Measurement (Materials Delivered by Weight (Mass)) Material

  • Table of Contents Section No. Page No. PART I GENERAL ...

    Table 901-2 Portland Cement Concrete Mixture Substitutions.....920 Table 901-3 Master Proportion Table for Portland Cement Concrete.....932 Table 901 …

  • 502 - PORTLAND CEMENT CONCRETE PAVEMENT (NON …

    502 - PORTLAND CEMENT CONCRETE PAVEMENT (NON-QC/QA) 500-23 SECTION 502 PORTLAND CEMENT CONCRETE PAVEMENT (NON-QC/QA) Note: PCCP is considered NON-QC/QA when the bid item Quality Control Testing is not included in the contract. 502.1 DESCRIPTION Construct portland cement concrete pavement (PCCP) on a prepared subgrade or base course.

  • * USE IN CONJUNCTION WITH STORED ... - Smooth Pavements

    item for Portland cement concrete pavement. Cracked pavement slabs which require repair in accordance with the provisions of Subsection 401-4.03(B) will be paid for at 80 percent of the contract unit price for the pavement repaired, as measured between the original longitudinal and transverse pavement joints abutting

  • 2015 DIVISION 400 - CONCRETE-FINAL

    Documents, select the type of portland cement or blended hydraulic cement according to TABLE 401-1. Design concrete with a maximum water to cementitious ratio of 0.50 and minimum cementitious content of 480 lbs per cubic yard except for concrete for pavement and shoulders. d. Blended Cement Concrete.

  • DIVISION 400 – PAVEMENTS

    SECTION 475 – PORTLAND CEMENT CONCRETE PAVEMENT SECTION 401 – PLANT MIX PAVEMENTS – GENERAL 401.1 – GENERAL 401.2 – MATERIALS A. Aggregates B. Bitumen C. Job Mix 401.3– CONSTRUCTION OPERATIONS A. Mixing Plants B. Placing Paving C. Compaction D. Joints 401.1 – GENERAL Plant mix pavements comprise a large percentage of the State's ...

  • 401 PORTLAND CEMENT CONCRETE PAVEMENT

    The details for batching, hauling, and mixing materials for Portland cement concrete used in concrete pavements will be discussed in Section 1006 of this manual and the applicable portions of Section 401-3. One of the most important requirements for obtaining a smooth and durable concrete pavement is maintaining a uniform slump in the concrete ...

  • SECTION 500 -- CONCRETE PAVEMENT SECTION 501 -- …

    This work shall consist of QC/QA portland cement concrete pavement, PCCP, placed on a preparedsubgrade orsubbase in accordance with 105.03. 501.02 Quality Control. The mixture for PCCP shall be produced by an approved plant in accordance with ITM 405, transported, and placed according to a

  • Section 701 - Portland Cement Concrete for Structures ...

    Jul 26, 2013· Portland Cement Concrete for Structures. UNOFFICIAL TEST VERSION This version of this document is not intended to be used as reference in any legal matter. For the official version, please refer to the 2012 Standard Specifications for Construction - Section 701.

  • SECTION 4.01 CONCRETE PAVEMENT - Connecticut

    CONCRETE PAVEMENT 4.01.01--Description: This pavement shall consist of Portland Cement Concrete, with or without reinforcement, in conformity with the lines, grades, thickness, and typical cross section as shown on the plans. 4.01.02--Materials: The materials for this work shall conform to the requirements for concrete pavement under M.03.

  • 02700 - PORTLAND CEMENT CONCRETE PAVEMENT

    PORTLAND CEMENT CONCRETE PAVEMENT SECTION 02700 PORTLAND CEMENT CONCRETE PAVEMENT PART 1 GENERAL 1.01 – GENERAL 1.02 – Section Includes ... Limestone: IM 401 9. Aggregates a. Fine aggregates 1) Standard Specification – …

  • ITEM 451 REINFORCED PORTLAND CEMENT CONCRETE PAVEMENT

    ITEM 451 REINFORCED PORTLAND CEMENT CONCRETE PAVEMENT. 451.01 Description 451.02 Materials 451.03 Equipment 451.04 Setting Forms 451.05 Fine Grading of Subgrade or Subbase 451.06 Placing Concrete 451.07 Placing Reinforcement 451.08 Joints 451.09 Finishing 451.10 Curing 451.11 Removing Forms 451.12 Surface Smoothness

  • Forms and Manuals - New York State Department of ...

    03/1998. BR 317. Aggregate Tests For Portland Cement Concrete Plant. 07/2009. BR 319. SUPERPAVE Design PGB Content Compacted Specimen Density Worksheet. 01/2017. BR 324a. Computation of Daily Quantity Adjustment Factors for Air Voids Controlled Mixtures.

  • Section 601 - Portland Cement Concrete for Pavements ...

    Jul 29, 2013· 601.01. Description. This work consists of providing and placing a concrete mixture of portland cement, blended portland cement, supplemental cementitious materials, fine aggregate, coarse aggregate, water, and admixtures, combined in proportions for the grades of concrete required. The term "sack" refers to a 94 pound sack of cement.

  • WEST IA DEPARTMENT OF TRANSPORTATION …

    Dec 07, 2017· 401.12 Method of Measurement DIVISION 500-RIGID PAVEMENT 501 Portland Cement Concrete Payment 13 501.9.1 Safety Edge 501.13 Surface Tolerance 501.22 Method of Measurement DIVISION 600-INCIDENTAL CONSTRUCTION 601 Structural Concrete 15 601.7 Mixing 601.11.4.3 Straightedge Testing of Hardened Bridge Decks

  • Concrete Pavement - Portland Cement Association

    Portland Cement Association. 5420 Old Orchard Road; Skokie, Illinois 60077-1083; 847.966.6200 ; 200 Massachusetts Ave NW, Suite 200; Washington D.C., 20001

  • DATE OF REQUEST: REQUESTOR'S ORGANIZATION

    401-Portland-Cement-Concrete-Pavement-Request-Form Author: ADOT Created Date: 8/15/2017 11:44:26 AM ...

  • CHAPTER 4: SURFACE TREATMENTS AND PAVEMENTS

    Jul 25, 2000· 401 PORTLAND CEMENT CONCRETE PAVEMENT . 401-1 Description . High quality concrete pavement requires characteristics of durability and structural soundness in order to withstand the destructive forces of traffic, changes in moisture, temperature, and variable soil conditions.

  • ITEM 608.01030009 DESIGN OF CURB RAMP …

    Plant Production 401-2 Portland Cement Concrete - General 501-2 Portland Cement Concrete Foundation for Pavement 503-2 Sidewalks, Driveways, Bicycle Paths and Vegetation Control Strips 608-2 Curb and Curb & Gutter 609-2 Topsoil 610-2.01 Turf Establishment 610-2.03 Work Zone Traffic Control 619-2 Traffic Signals 680-2

  • City of Lincoln 2020 Standard Specifications Chapter 4 ...

    2020 city of lincoln standard specifications 401 chapter 4 – portland cement concrete (pcc) pavement . city of lincoln, nebraska, standard specifications chapter 4 portland cement concrete (pcc) pavement article title 4.09 f. combined curb and gutter, concrete barrier curb, or concrete median curb 413

  • ODOT District 4 --- Pavement General Notes

    Jun 21, 2005· item 254 pavement planing, asphalt concrete, as per plan. revised 06/07/2004p402: item 254 - pavement planing, portland cement concrete, as per plan this item of work shall be performed in conformance with item 254 in the cms except the depth shall vary from 2" to the top of the adjacent brick whichever is first.

  • 401 - CONCRETE SECTION 401 CONCRETE DIVISION 1100 …

    Documents, select the type of portland cement or blended hydraulic cement according to TABLE 401-5. TABLE 401-5: PORTLAND CEMENT & BLENDED HYDRAULIC CEMENT Concrete for: Type of Cement Allowed Bridge Deck Wearing Surface and Concrete Pavement Type IP Portland-Pozzolan Cement Type I(PM) Pozzolan Modified Portland Cement

  • REVISED ITEM P-501 - PORTLAND CEMENT CONCRETE …

    PROPOSED SPECIFICATION FOR CONCRETE AIRFIELD PAVEMENT 1.0 DESCRIPTION 1.1 General This work shall consist of pavement composed of hydraulic cement concrete, constructed on a prepared underlying surface, in accordance with these specifications and shall conform to the lines, grades, thickness, and typical cross sections shown on the plans.

  • SECTION 501 PORTLAND CEMENT CONCRETE PAVEMENT

    PORTLAND CEMENT CONCRETE PAVEMENT 501.01 DESCRIPTION This work is the construction of PCCP on a prepared subgrade or base course. 501.02 MATERIALS 501.02.1 Concrete Furnish concrete in accordance withSection 551 for Class Pave concrete. A. Cement. Furnish Type I or II portland cement listed on the QPL, in accordance with Subsection 551.02.1.

  • PART IV -- SURFACE COURSES

    Recycled Portland Cement Concrete 1.30 Reclaimed Asphaltic Pavement 1.50 Materials delivered by weight (mass) will be measured by the ton (2,000 pounds) [Mg (1,000 kg)] in hauling vehicles and divided by the following factors to determine the pay volume: Table 401-2 Adjusted Vehicular Measurement (Materials Delivered by Weight (Mass)) Material

  • Table of Contents Section No. Page No. PART I GENERAL ...

    Table 901-2 Portland Cement Concrete Mixture Substitutions.....920 Table 901-3 Master Proportion Table for Portland Cement Concrete.....932 Table 901 …

  • 502 - PORTLAND CEMENT CONCRETE PAVEMENT (NON …

    502 - PORTLAND CEMENT CONCRETE PAVEMENT (NON-QC/QA) 500-23 SECTION 502 PORTLAND CEMENT CONCRETE PAVEMENT (NON-QC/QA) Note: PCCP is considered NON-QC/QA when the bid item Quality Control Testing is not included in the contract. 502.1 DESCRIPTION Construct portland cement concrete pavement (PCCP) on a prepared subgrade or base course.